+Article 16 11.

Article 16 11.

As far as technically possible, transmission system operators shall net the capacity requirements of any power flows in opposite directions over the congested interconnection line in order to use that line to its maximum capacity. Having full regard to network security, transactions that relieve the congestion shall not be refused.

1. Apžvalga

,
Pavadinimas Reguliavimas

1.1 Nuorodos

1.2 Nustatyti reikalavimai

1.3 Susiję standartai

2. Nustatyti reikalavimai

Reikalavimai
Šaltinis Reikalavimas

3. Susiję standartai

Standartai
Šaltinis Reikalavimas