+Article 16 11.

Article 16 11.

As far as technically possible, transmission system operators shall net the capacity requirements of any power flows in opposite directions over the congested interconnection line in order to use that line to its maximum capacity. Having full regard to network security, transactions that relieve the congestion shall not be refused.

1. Overzicht

,
Titel Regelgeving

1.1 Referenties

1.2 Geïdentificeerde eisen

1.3 Gerelateerde standaarden

2. Geïdentificeerde eisen

Eisen
Bron Eis

3. Gerelateerde standaarden

Standaarden
Bron Eis