+Article 17 2.

Article 17 2.

Transmission system operators shall propose an appropriate structure for the allocation of cross-zonal capacity across timeframes, including day-ahead, intraday and balancing. That allocation structure shall be subject to review by the relevant regulatory authorities. In drawing up their proposal, the transmission system operators shall take into account:

(a) 

the characteristics of the markets;

(b) 

the operational conditions of the electricity system, such as the implications of netting firmly declared schedules;

(c) 

the level of harmonisation of the percentages allocated to different timeframes and the timeframes adopted for the different cross-zonal capacity allocation mechanisms that are already in place.

1. Pārskats

,
Nosaukums Regulējums

1.1 Atsauces

1.2 Identificētās prasības

1.3 Saistītie standarti

2. Identificētās prasības

Prasības
Avots Prasība

3. Saistītie standarti

Standarti
Avots Prasība