|
+Article 17 2. |
Article 17 2.Transmission system operators shall propose an appropriate structure for the allocation of cross-zonal capacity across timeframes, including day-ahead, intraday and balancing. That allocation structure shall be subject to review by the relevant regulatory authorities. In drawing up their proposal, the transmission system operators shall take into account:
(a)
the characteristics of the markets;
(b)
the operational conditions of the electricity system, such as the implications of netting firmly declared schedules;
(c)
the level of harmonisation of the percentages allocated to different timeframes and the timeframes adopted for the different cross-zonal capacity allocation mechanisms that are already in place. 1. Översikt
1.1 Referenser1.2 Identifierade krav1.3 Relaterade standarder2. Identifierade krav
3. Relaterade standarder
|