+Article 5 5. |
Article 5 5.A proposal for enabling or enhancing bi-directional capacity or a request for granting or prolongation of an exemption shall include a cost-benefit analysis prepared on the basis of the methodology pursuant to Article 11 of Regulation (EU) No 347/2013 of the European Parliament and of the Council ( 2 ) and shall be based on the following elements:
(a)
an assessment of market demand;
(b)
projections for demand and supply;
(c)
the possible economic impact on existing infrastructure;
(d)
a feasibility study;
(e)
the costs of bi-directional capacity including the necessary reinforcement of the transmission system; and
(f)
the benefits to the security of gas supply taking into account the possible contribution of bi-directional capacity to meeting the infrastructure standard set out in this Article. 1. Ħarsa ġenerali
1.1 Referenzi1.2 Rekwiżiti identifikati1.3 Standards relatati2. Rekwiżiti identifikati
3. Standards relatati
|