+Article 5 5.

Article 5 5.

A proposal for enabling or enhancing bi-directional capacity or a request for granting or prolongation of an exemption shall include a cost-benefit analysis prepared on the basis of the methodology pursuant to Article 11 of Regulation (EU) No 347/2013 of the European Parliament and of the Council ( 2 ) and shall be based on the following elements:

(a) 

an assessment of market demand;

(b) 

projections for demand and supply;

(c) 

the possible economic impact on existing infrastructure;

(d) 

a feasibility study;

(e) 

the costs of bi-directional capacity including the necessary reinforcement of the transmission system; and

(f) 

the benefits to the security of gas supply taking into account the possible contribution of bi-directional capacity to meeting the infrastructure standard set out in this Article.

1. Visão geral

,
Título Regulamentação

1.1 Referências

1.2 Requisitos identificados

1.3 Normas relacionadas

2. Requisitos identificados

Requisitos
Fonte Requisito

3. Normas relacionadas

Normas
Fonte Requisito