+Article 60 3

Article 60 3

3.   When developing the Union-wide network development plan for hydrogen, the ENNOH shall cooperate with the ENTSO for Electricity and with the ENTSO for Gas, in particular on the development of the energy system wide cost-benefit analysis and the interlinked energy market and network model including electricity, natural gas and hydrogen transport infrastructure as well as natural gas storage, hydrogen storage, LNG and hydrogen terminals and electrolysers referred to in Article 11 of Regulation (EU) 2022/869, the scenarios for the ten-year network development plans referred to in Article 12 of that Regulation and the infrastructure gaps identification referred to in Article 13 of that Regulation.

1. Overzicht

,
Titel Regelgeving

1.1 Referenties

1.2 Geïdentificeerde eisen

1.3 Gerelateerde standaarden

2. Geïdentificeerde eisen

Eisen
Bron Eis

3. Gerelateerde standaarden

Standaarden
Bron Eis
  • Builddate: 15.07.2024 00:00:00 -Doknr: CELEX:32024R1789
  • EULAW -

    EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.

    DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.