|
+Article 25 2. |
Article 25 2.With regard to the bridge institution tool, the resolution scheme shall establish:
(a)
the instruments, assets, rights and liabilities to be transferred to a bridge institution by the national resolution authority in accordance with Article 40(1) to (12) of Directive 2014/59/EU;
(b)
the arrangements for the setting up, the operation and the termination of the bridge institution by the national resolution authority in accordance with Article 41(1), (2), (3) and (5) to (9) of Directive 2014/59/EU;
(c)
the arrangements for the marketing of the bridge institution or its assets or liabilities by the national resolution authority in accordance with Article 41(4) of Directive 2014/59/EU. 1. Przegląd
1.1 Odwołania1.2 Zidentyfikowane wymagania1.3 Powiązane normy2. Zidentyfikowane wymagania
3. Powiązane normy
|