+Article 40 3

Article 40 3

3.   By 5 August 2025, the EU DSO entity shall submit to the Commission and to ACER draft updated statutes, including a code of conduct, a list of registered members, draft updated rules of procedure, including rules of procedure on the consultation with the ENTSO for Electricity, the ENTSO for Gas and other stakeholders, and draft updated financing rules.

The draft updated rules of procedure of the EU DSO entity shall ensure fair and balanced representation of all participating distribution system operators, including those owning or operating natural gas systems, and of hydrogen distribution network operators.

1. Visão geral

,
Título Regulamentação

1.1 Referências

1.2 Requisitos identificados

1.3 Normas relacionadas

2. Requisitos identificados

Requisitos
Fonte Requisito

3. Normas relacionadas

Normas
Fonte Requisito