+Articolul 11b Activități bazate pe proiecte
---+Article 11b 1.
---+Article 11b 2.
---+Article 11b 3.
---+Article 11b 4.
---+Article 11b 5.
---+Article 11b 6.
|
Articolul 11b Activități bazate pe proiecte
1. Prezentare generală
| Titlu |
Reglementare |
|
Article 11b 1.
|
Member States shall take all necessary measures to ensure that baselines for project activities, as defined by subsequent decisions adopted under the UNFCCC or the Kyoto Protocol, undertaken in countries having signed a Treaty of Accession with the Union fully comply with the acquis communautaire, including the temporary derogations set out in that Treaty of Accession. The
►M9
Union ◄ and its Member States shall only authorise project activities where all project participants have headquarters either in a country that has concluded the international agreement relating to such projects or in a country or sub-federal or regional entity which is linked to the
►M9
EU ETS ◄ pursuant to Article 25.
|
|
Article 11b 2.
|
Except as provided for in paragraphs 3 and 4, Member States hosting project activities shall ensure that no ERUs or CERs are issued for reductions or limitations of greenhouse gas emissions from
►M2
activities ◄ falling within the scope of this Directive.
|
|
Article 11b 3.
|
Until 31 December 2012, for JI and CDM project activities which reduce or limit directly the emissions of an installation falling within the scope of this Directive, ERUs and CERs may be issued only if an equal number of allowances is cancelled by the operator of that installation.
|
|
Article 11b 4.
|
Until 31 December 2012, for JI and CDM project activities which reduce or limit indirectly the emission level of installations falling within the scope of this Directive, ERUs and CERs may be issued only if an equal number of allowances is cancelled from the national registry of the Member State of the ERUs’ or CERs’ origin.
|
|
Article 11b 5.
|
A Member State that authorises private or public entities to participate in project activities shall remain responsible for the fulfilment of its obligations under the UNFCCC and the Kyoto Protocol and shall ensure that such participation is consistent with the relevant guidelines, modalities and procedures adopted pursuant to the UNFCCC or the Kyoto Protocol.
|
|
Article 11b 6.
|
In the case of hydroelectric power production project activities with a generating capacity exceeding 20 MW, Member States shall, when approving such project activities, ensure that relevant international criteria and guidelines, including those contained in the World Commission on Dams November 2000 Report ‘Dams and Development — A New Framework for Decision-Making’, will be respected during the development of such project activities.
|
,
1.1 Referințe
1.2 Cerințe identificate
1.3 Standarde asociate
2. Cerințe identificate
3. Standarde asociate
- Builddate: 01.03.2024 00:00:00 -Doknr: CELEX:32003L0087
- EULAW -
EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.
DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.
|