+Article 21 1.

Article 21 1.

Where the deployment of smart metering systems has been negatively assessed as a result of the cost-benefit assessment referred to in Article 19(2) and where smart metering systems are not systematically deployed, Member States shall ensure that every final customer is entitled on request, while bearing the associated costs, to have installed or, where applicable, to have upgraded, under fair, reasonable and cost-effective conditions, a smart meter that:

(a) 

is equipped, where technically feasible, with the functionalities referred to in Article 20, or with a minimum set of functionalities to be defined and published by Member States at national level in accordance with Annex II;

(b) 

is interoperable and able to deliver the desired connectivity of the metering infrastructure with consumer energy management systems in near real-time.

1. Prezentare generală

,
Titlu Reglementare

1.1 Referințe

1.2 Cerințe identificate

1.3 Standarde asociate

2. Cerințe identificate

Cerințe
Sursă Cerință

3. Standarde asociate

Standarde
Sursă Cerință
  • Builddate: 12.10.2025 00:00:00 -Doknr: CELEX:32019L0944
  • EULAW -

    EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.

    DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.