+Article 10 1.
|
Article 10 1.
All newly constructed buildings and buildings undergoing major renovation works, including elements under joint ownership, for which applications for building permits have been submitted after 12 February 2026, shall be equipped with a fibre-ready in-building physical infrastructure and in-building fibre wiring, including connections up to the physical point where the end user connects to the public network.
1. Prezentare generală
1.1 Referințe
1.2 Cerințe identificate
1.3 Standarde asociate
2. Cerințe identificate
3. Standarde asociate
- Builddate: 08.05.2024 00:00:00 -Doknr: CELEX:32024R1309
- EULAW -
EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.
DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.
|