Article 28 2.
The conditions laid down in point (i) of paragraph 1 shall be deemed to be met notwithstanding a write down on a permanent basis of the principal amount of Additional Tier 1 or Tier 2 instruments. The condition laid down in point (f) of paragraph 1 shall be deemed to be met notwithstanding the reduction of the principal amount of the capital instrument within a resolution procedure or as a consequence of a write down of capital instruments required by the resolution authority responsible for the institution. The condition laid down in point (g) of paragraph 1 shall be deemed to be met notwithstanding the provisions governing the capital instrument indicating expressly or implicitly that the principal amount of the instrument would or might be reduced within a resolution procedure or as a consequence of a write down of capital instruments required by the resolution authority responsible for the institution.
1. Prezentare generală
1.1 Referințe
1.2 Cerințe identificate
1.3 Standarde asociate
2. Cerințe identificate
3. Standarde asociate
|