+Article 3 7.

Article 3 7.

Projects of common interest that fall under the energy infrastructure categories set out in point (1)(a), (b), (c), (d) and (f) of Annex II and that are competing projects or projects that have not reached a sufficient degree of maturity to provide a project-specific cost-benefit analysis as referred to in Section 2, point (1)(d), of Annex III may be included in the relevant regional investment plans, the national ten-year network development plans and other national infrastructure plans, as appropriate, as projects under consideration.

1. Översikt

,
Rubrik Reglering

1.1 Referenser

1.2 Identifierade krav

1.3 Relaterade standarder

2. Identifierade krav

Krav
Källa Krav

3. Relaterade standarder

Standarder
Källa Krav