+SYS.1.8.A7 Planning of Storage Solutions (S)

SYS.1.8.A7 Planning of Storage Solutions (S)

Before storage solutions are implemented in an organisation, a requirements analysis SHOULD be carried out. The requirements analysis SHOULD consider, among other things, the topics of performance and capacity. Based on the requirements identified, a detailed plan for storage solutions SHOULD then be drawn up. The following items SHOULD be taken into account:

  • selection of manufacturers and suppliers
  • decision for or against central administration systems (management systems)
  • planning of the network connection
  • planning of the infrastructure
  • integration into existing processes

1. Oversigt

Titel Standard

1.1 Referencer

1.2 Identificerede krav

1.3 Relaterede reguleringer

2. Identificerede krav

Krav
Kilde Krav

3. Relaterede reguleringer

Reguleringer
Kilde Regulering

Linkede sager