+SYS.1.8.A7 Planning of Storage Solutions (S)
|
SYS.1.8.A7 Planning of Storage Solutions (S)
Before storage solutions are implemented in an organisation, a requirements analysis SHOULD be carried out. The requirements analysis SHOULD consider, among other things, the topics of performance and capacity. Based on the requirements identified, a detailed plan for storage solutions SHOULD then be drawn up. The following items SHOULD be taken into account: - selection of manufacturers and suppliers
- decision for or against central administration systems (management systems)
- planning of the network connection
- planning of the infrastructure
- integration into existing processes
1. Przegląd
1.1 Odwołania
1.2 Zidentyfikowane wymagania
1.3 Powiązane regulacje
2. Zidentyfikowane wymagania
Wymagania
| Źródło |
Wymaganie |
3. Powiązane regulacje
Regulacje
| Źródło |
Regulacja |
Powiązane zgłoszenia
|