+SYS.1.8.A7 Planning of Storage Solutions (S)

SYS.1.8.A7 Planning of Storage Solutions (S)

Before storage solutions are implemented in an organisation, a requirements analysis SHOULD be carried out. The requirements analysis SHOULD consider, among other things, the topics of performance and capacity. Based on the requirements identified, a detailed plan for storage solutions SHOULD then be drawn up. The following items SHOULD be taken into account:

  • selection of manufacturers and suppliers
  • decision for or against central administration systems (management systems)
  • planning of the network connection
  • planning of the infrastructure
  • integration into existing processes

1. Resumen

Título Estándar

1.1 Referencias

1.2 Requisitos identificados

1.3 Regulaciones relacionadas

2. Requisitos identificados

Requisitos
Fuente Requisito

3. Regulaciones relacionadas

Regulaciones
Fuente Regulación

Incidencias vinculadas

Vínculos
Tipo de vínculo Incidencia
blocks G 0.18 Poor Planning or Lack of Adaptation