+Article 6 10.

Article 6 10.

At the request of the transmission system operator, the regulatory authority may decide to extend the contractual period of the remaining part of balancing capacity referred to in paragraph 9 to a maximum period of twelve months provided that such a decision is limited in time, and the positive effects in terms of lowering of costs for final customers exceed the negative impacts on the market. The request shall include:

(a) 

the specific period during which the exemption would apply;

(b) 

the specific volume of balancing capacity to which the exemption would apply;

(c) 

an analysis of the impact of the exemption on the participation of balancing resources; and

(d) 

a justification for the exemption demonstrating that such an exemption would lead to lower costs to final customers.

1. Übersicht

,
Bezeichnung Regulierung

1.1 Referenzen

1.2 Identifizierte Anforderungen

1.3 Zugehörige Standards

2. Identifizierte Anforderungen

Anforderungen
Quelle Anforderung

3. Zugehörige Standards

Standards
Quelle Anforderung
  • Builddate: 16.07.2024 00:00:00 -Doknr: CELEX:32019R0943
  • EULAW -

    EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.

    DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.