+Article 14 Early warning and declaration of an electricity crisis
---+Article 14 1
---+Article 14 2
---+Article 14 3
---+Article 14 4

Article 14 Early warning and declaration of an electricity crisis

1. Overview

,
Summary Regulation
Article 14 1

1.   Where a seasonal adequacy assessment or other qualified source provides concrete, serious and reliable information that an electricity crisis may occur in a Member State, the competent authority of that Member State shall, without undue delay, issue an early warning to the Commission, the competent authorities of the Member States within the same region and, where they are not in the same region, the competent authorities of the directly connected Member States. The competent authority concerned shall also provide information on the causes of the possible electricity crisis, on measures planned or taken to prevent an electricity crisis and on the possible need for assistance from other Member States. The information shall include the possible impacts of the measures on the internal electricity market. The Commission shall provide that information to the ECG.

Article 14 2

2.   When confronted with an electricity crisis, the competent authority shall, after consulting the transmission system operator concerned, declare an electricity crisis and inform the competent authorities of the Member States within the same region and, where they are not in the same region, the competent authorities of directly connected Member States, as well as the Commission, without undue delay. That information shall include the causes of the deterioration of the electricity supply situation, the reasons for declaring an electricity crisis, the measures planned or taken to mitigate it and the need for any assistance from other Member States.

Article 14 3

3.   Where they consider the information provided pursuant to paragraph 1 or 2 to be insufficient, the Commission, the ECG or the competent authorities of the Member States within the same region and, where they are not in the same region, the competent authorities of directly connected Member States may request the Member State concerned to provide additional information.

Article 14 4

4.   Where a competent authority issues an early warning or declares an electricity crisis, the measures set out in the risk-preparedness plan shall be followed to the fullest extent possible.

1.1 References

1.2 Identified Requirements

1.3 Related Standards

2. Identified Requirements

Requirements
Source Requirement

3. Related Standards

Standards
Source Requirement
  • Builddate: 14.06.2019 00:00:00 -Doknr: CELEX:32019R0941
  • EULAW -

    EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.

    DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.