+Article 14 3.

Article 14 3.

The size of the guarantee shall be periodically adjusted in accordance with any rehabilitation work needed to be carried out on the land affected by the waste facility, as described in the waste management plan prepared pursuant to Article 5 and required by the Article 7 permit.

1. Ülevaade

,
Pealkiri Regulatsioon

1.1 Viited

1.2 Tuvastatud nõuded

1.3 Seotud standardid

2. Tuvastatud nõuded

Nõuded
Allikas Nõue

3. Seotud standardid

Standardid
Allikas Nõue