|
+Article 14 3. |
Article 14 3.The size of the guarantee shall be periodically adjusted in accordance with any rehabilitation work needed to be carried out on the land affected by the waste facility, as described in the waste management plan prepared pursuant to Article 5 and required by the Article 7 permit.
1. Ħarsa ġenerali
1.1 Referenzi1.2 Rekwiżiti identifikati1.3 Standards relatati2. Rekwiżiti identifikati
3. Standards relatati
|