+Article 14 3.

Article 14 3.

The size of the guarantee shall be periodically adjusted in accordance with any rehabilitation work needed to be carried out on the land affected by the waste facility, as described in the waste management plan prepared pursuant to Article 5 and required by the Article 7 permit.

1. Yleiskatsaus

,
Otsikko Sääntely

1.1 Viittaukset

1.2 Tunnistetut vaatimukset

1.3 Liittyvät standardit

2. Tunnistetut vaatimukset

Vaatimukset
Lähde Vaatimus

3. Liittyvät standardit

Standardit
Lähde Vaatimus