+Business Continuity Management System (BCMS)
---+Defined Operational Resilience Requirements
|
Business Continuity Management System (BCMS)
Description
Mechanisms exist to operate a Business Continuity Management System (BCMS) to achieve resilient Technology Assets, Applications, Services and/or Data (TAASD) during: (1) Routine operations; and (2) Adverse conditions.
Possible Solutions & Considerations
Micro-Small Business (<10 staff) / BLS Firm Size Classes 1-2
∙ Continuity of Operations Plan (COOP) ∙ Business Continuity Plan (BCP) ∙ Disaster Recovery Plan (DRP) ∙ Business Impact Analysis (BIA) ∙ Criticality assessments
Small Business (10-49 staff) / BLS Firm Size Classes 3-4
∙ Continuity of Operations Plan (COOP) ∙ Business Continuity Plan (BCP) ∙ Disaster Recovery Plan (DRP) ∙ Business Impact Analysis (BIA) ∙ Criticality assessments
Medium Business (50-249 staff) / BLS Firm Size Classes 5-6
∙ Continuity of Operations Plan (COOP) ∙ Business Continuity Plan (BCP) ∙ Disaster Recovery Plan (DRP) ∙ Business Impact Analysis (BIA) ∙ Criticality assessments
Large Business (250-999 staff) / BLS Firm Size Classes 7-8
∙ Continuity of Operations Plan (COOP) ∙ Business Continuity Plan (BCP) ∙ Disaster Recovery Plan (DRP) ∙ Business Impact Analysis (BIA) ∙ Criticality assessments
Enterprise (> 1,000 staff) / BLS Firm Size Class 9
∙ Continuity of Operations Plan (COOP) ∙ Business Continuity Plan (BCP) ∙ Disaster Recovery Plan (DRP) ∙ Business Impact Analysis (BIA) ∙ Criticality assessments
SCR-CMM
Level 0 Not Performed
Practices are non-existent, based on the inability to demonstrate an implemented and operational capability. A reasonable person would conclude the control is not being performed.
Level 1 Performed Informally
Business Continuity & Disaster Recovery (BCD) domain capabilities are ad hoc and inconsistent. Capability criteria associated with this control may include: ▪ Policies, standards & procedures associated with BCD domain capabilities provide limited coverage due to the depth and breadth of the existing documentation. ▪ Contingency management-related activities are decentralized (e.g., a localized/regionalized function) and uses non-standardized methods to implement secure, resilient and compliant practices. ▪ Limited technologies exist to support near real-time network infrastructure failover (e.g., redundant ISPs and redundant power). ▪ IT and/or cybersecurity personnel develop limited Disaster Recovery Plans (DRP) to recover business-critical Technology Assets, Applications and/or Services (TAAS) and services.
Level 2 Planned Tracked
Business Continuity & Disaster Recovery (BCD) capabilities are requirements-driven, but are not standardized across the entity (e.g., local/regional level consistency). Capability criteria associated with this control reasonably expect the following criteria to exist: ▪ Policies and standards associated with BCD domain capabilities are formally documented and centrally-managed by the entity. ▪ Standardized Operating Procedures (SOP) associated with BCD domain capabilities are documented and maintained by process owners. ▪ IT and/or cybersecurity personnel work with business stakeholders and process owners to appropriately scope and reasonably implement cybersecurity and data protection controls associated with BCD domain capabilities to address applicable statutory, regulatory and/or contractual requirements for Technology Assets, Applications, Services and/or Data (TAASD). ▪ Business Continuity / Disaster Recovery (BC/DR)-related controls are primarily administrative and preventative in nature (e.g., policies, standards and procedures & guidelines). ▪ BC/DR may be a defined function (e.g., team or department) or assigned as an additional duty to existing IT and/or cybersecurity personnel. ▪ Business stakeholders and process owners identify business-critical TAASD and External Service Providers (ESPs). ▪ IT and/or cybersecurity personnel work with business stakeholders and process owners to identify single points of failure from a TAASD perspective. ▪ IT and/or cybersecurity personnel work with business stakeholders and process owners to develop BC/DR plans to recover business-critical TAASD. ▪ Data/process owners conduct a Business Impact Analysis (BIA) at least annually, or after any major technology or process change, to identify TAASD that are critical to the business, as well as single points of failure. ▪ Business stakeholders and process owners designate alternative decision-makers if primary decision-makers are unavailable.
Level 3 Well Defined
Business Continuity & Disaster Recovery (BCD) capabilities are standardized across the entity for applicability to People, Processes, Technologies, Data and/or Facilities (PPTDF) to ensure consistency for Technology Assets, Applications, Services and/or Data (TAASD). Capability criteria associated with this control reasonably expect the following criteria to exist: ▪ Policies and standards associated with BCD domain capabilities are formally documented and centrally-managed by the entity's Governance, Risk & Compliance (GRC) team, or similar function. ▪ Standardized Operating Procedures (SOP) associated with BCD domain capabilities are well-documented and kept current by process owners. ▪ A Business Continuity & Disaster Recovery (BC/DR) team, or similar function, is appropriately staffed and supported to implement and maintain BCD domain capabilities. ▪ Technology is leveraged to enhance the efficiency and accuracy of BC/DR operations (e.g., BC/DR planning software, Disaster Recovery as a Service (DRaaS), Orchestration and Automation Tools). ▪ The entity's Governance, Risk & Compliance (GRC) team, or similar function, works with business stakeholders and process owners to appropriately scope and reasonably implement cybersecurity and data protection controls associated with BCD domain capabilities to address Minimum Compliance Requirements (MCR) (e.g., applicable statutory, regulatory and/or contractual requirements) and Discretionary Security Requirements (DSR) (e.g., entity-required controls). ▪ An implemented and operational capability exists to facilitate the implementation of contingency planning controls to help ensure resilient Technology Assets, Applications and/or Services (TAAS) (e.g., Continuity of Operations Plan (COOP) or BC/DR playbooks).
Level 4 Quantitatively Controlled
Utilize SCR-CMM Level 3 criteria definitions: ▪ There are no defined Level 4 criteria, since it is reasonable to assume a quantitatively-controlled process is not necessary to operationalize this control. ▪ While it may be possible to develop “metrics-driven” capabilities for this control, the criteria would be organization-specific to define. Business Continuity & Disaster Recovery (BCD) capabilities, in addition to being standardized across the entity and centrally managed to ensure consistency across Technology Assets, Applications, Services and/or Data (TAASD), efforts are metrics driven to provide sufficient insight for decision makers to predict optimal performance, ensure continued operations and/or identify areas for improvement. Capability criteria associated with this control reasonably expect the following criteria to exist: ▪ Applicable SCR-CMM Level 3 (Well Defined) capabilities are implemented and operational. ▪ Metrics reporting includes quantitative analysis of Key Performance Indicators (KPIs). ▪ Metrics reporting includes quantitative analysis of Key Risk Indicators (KRIs). ▪ Scope of metrics, KPIs and KRIs covers organization-wide cybersecurity and data protection controls, including functions performed by third-parties. ▪ Organizational leadership maintains a formal process to objectively review and respond to metrics, KPIs and KRIs (e.g., monthly or quarterly review). ▪ Based on metrics analysis, process improvement recommendations are submitted for review and are handled in accordance with change control processes. ▪ Business and technical stakeholders are involved in reviewing and approving proposed changes to evolve capabilities.
Level 5 Continuously Improving
Utilize SCR-CMM Level 3 or Level 4 (if available) criteria definitions: ▪ There are no defined Level 5 criteria, since it is reasonable to assume a continuously-improving process is not necessary to operationalize this control. ▪ Level 5 capabilities should be considered “world-class” where the control builds on Level 4 capabilities, but are continuously improving through Artificial Intelligence (AI) and/or Machine Learning (ML) technologies. ▪ While it may be possible to develop responsive capabilities for this control through the use of AI and/or ML technologies, the criteria would be organization-specific to define.
1. Forbhreathnú
| Teideal |
Caighdeán |
|
Defined Operational Resilience Requirements
|
Description
Mechanisms exist to define operational resilience requirements for Technology Assets, Applications, Services and/or Data (TAASD) to operate in a controlled and acceptable manner during: (1) Routine operations; and (2) Adverse conditions.
Possible Solutions & Considerations
Micro-Small Business (<10 staff) / BLS Firm Size Classes 1-2
∙ Business Impact Analysis (BIA) ∙ Documented RTO/RPO for critical systems
Small Business (10-49 staff) / BLS Firm Size Classes 3-4
∙ Business Impact Analysis (BIA) ∙ Documented RTO/RPO/MTD for critical systems ∙ Business Continuity Plan (BCP)
Medium Business (50-249 staff) / BLS Firm Size Classes 5-6
∙ Business Impact Analysis (BIA) ∙ Continuity of Operations Plan (COOP) ∙ Documented resilience requirements per system in the CMDB
Large Business (250-999 staff) / BLS Firm Size Classes 7-8
∙ Business Impact Analysis (BIA) ∙ Continuity of Operations Plan (COOP) ∙ BC/DR platform (e.g., Fusion Risk Management, Castellan) ∙ Resilience requirements traced to architecture and backup design
Enterprise (> 1,000 staff) / BLS Firm Size Class 9
∙ Enterprise operational resilience program (e.g., aligned with ISO 22301 and DORA) ∙ BC/DR platform (e.g., Fusion Risk Management, ServiceNow BCM) ∙ Resilience requirements traced to architecture, backup and failover design ∙ Annual requirements recertification
SCR-CMM
Level 0 Not Performed
Practices are non-existent, based on the inability to demonstrate an implemented and operational capability. A reasonable person would conclude the control is not being performed.
Level 1 Performed Informally
Business Continuity & Disaster Recovery (BCD) domain capabilities are ad hoc and inconsistent. Capability criteria associated with this control may include: ▪ Policies, standards & procedures associated with BCD domain capabilities provide limited coverage due to the depth and breadth of the existing documentation. ▪ Contingency management-related activities are decentralized (e.g., a localized/regionalized function) and uses non-standardized methods to implement secure, resilient and compliant practices. ▪ IT and/or cybersecurity personnel develop limited Disaster Recovery Plans (DRP) to recover business-critical Technology Assets, Applications and/or Services (TAAS) and services. ▪ Recovery Time Objectives (RTOs) and/or Recovery Point Objectives (RPOs) are not formally planned for or resourced to meet.
Level 2 Planned Tracked
Business Continuity & Disaster Recovery (BCD) capabilities are requirements-driven, but are not standardized across the entity (e.g., local/regional level consistency). Capability criteria associated with this control reasonably expect the following criteria to exist: ▪ Policies and standards associated with BCD domain capabilities are formally documented and centrally-managed by the entity. ▪ Standardized Operating Procedures (SOP) associated with BCD domain capabilities are documented and maintained by process owners. ▪ IT and/or cybersecurity personnel work with business stakeholders and process owners to appropriately scope and reasonably implement cybersecurity and data protection controls associated with BCD domain capabilities to address applicable statutory, regulatory and/or contractual requirements for Technology Assets, Applications, Services and/or Data (TAASD). ▪ Business Continuity / Disaster Recovery (BC/DR)-related controls are primarily administrative and preventative in nature (e.g., policies, standards and procedures & guidelines). ▪ BC/DR may be a defined function (e.g., team or department) or assigned as an additional duty to existing IT and/or cybersecurity personnel.
Level 3 Well Defined
Business Continuity & Disaster Recovery (BCD) capabilities are standardized across the entity for applicability to People, Processes, Technologies, Data and/or Facilities (PPTDF) to ensure consistency for Technology Assets, Applications, Services and/or Data (TAASD). Capability criteria associated with this control reasonably expect the following criteria to exist: ▪ Policies and standards associated with BCD domain capabilities are formally documented and centrally-managed by the entity's Governance, Risk & Compliance (GRC) team, or similar function. ▪ Standardized Operating Procedures (SOP) associated with BCD domain capabilities are well-documented and kept current by process owners. ▪ A Business Continuity & Disaster Recovery (BC/DR) team, or similar function, is appropriately staffed and supported to implement and maintain BCD domain capabilities. ▪ Technology is leveraged to enhance the efficiency and accuracy of BC/DR operations (e.g., BC/DR planning software, Disaster Recovery as a Service (DRaaS), Orchestration and Automation Tools). ▪ The entity's Governance, Risk & Compliance (GRC) team, or similar function, works with business stakeholders and process owners to appropriately scope and reasonably implement cybersecurity and data protection controls associated with BCD domain capabilities to address Minimum Compliance Requirements (MCR) (e.g., applicable statutory, regulatory and/or contractual requirements) and Discretionary Security Requirements (DSR) (e.g., entity-required controls).
Level 4 Quantitatively Controlled
Utilize SCR-CMM Level 3 criteria definitions: ▪ There are no defined Level 4 criteria, since it is reasonable to assume a quantitatively-controlled process is not necessary to operationalize this control. ▪ While it may be possible to develop “metrics-driven” capabilities for this control, the criteria would be organization-specific to define.
Level 5 Continuously Improving
Utilize SCR-CMM Level 3 or Level 4 (if available) criteria definitions: ▪ There are no defined Level 5 criteria, since it is reasonable to assume a continuously-improving process is not necessary to operationalize this control. ▪ Level 5 capabilities should be considered “world-class” where the control builds on Level 4 capabilities, but are continuously improving through Artificial Intelligence (AI) and/or Machine Learning (ML) technologies. ▪ While it may be possible to develop responsive capabilities for this control through the use of AI and/or ML technologies, the criteria would be organization-specific to define.
|
1.1 Tagairtí
1.2 Ceanglais aitheanta
1.3 Rialacháin ghaolmhara
2. Ceanglais aitheanta
Ceanglais
| Foinse |
Ceanglas |
3. Rialacháin ghaolmhara
Rialacháin
| Foinse |
Rialáil |
|
EULAW
|
Airteagal 8 4
4. Sainaithneoidh eintitis airgeadais gach sócmhainn faisnéise agus gach sócmhainn TFC, lena n-áirítear na cinn ar shuíomhanna cianda, acmhainní gréasáin agus an trealamh crua-earraí, agus déanfaidh siad mapáil ar na cinn a meastar gur trealamh criticiúil iad. Déanfaidh siad mapáil ar chumraíocht na sócmhainní faisnéise agus sócmhainní TFC agus ar na naisc agus na hidirspleáchais idir na sócmhainní faisnéise agus sócmhainní TFC éagsúla.
|
|
EULAW
|
Airteagal 24 Comhpháirteanna an bheartais um leanúnachas gnó TFC
|
|
EULAW
|
Airteagal 24 Comhpháirteanna an bheartais um leanúnachas gnó TFC
|
|
EULAW
|
Airteagal 24 Comhpháirteanna an bheartais um leanúnachas gnó TFC
|
|
EULAW
|
Airteagal 24 Comhpháirteanna an bheartais um leanúnachas gnó TFC
|
|
EULAW
|
Airteagal 24 Comhpháirteanna an bheartais um leanúnachas gnó TFC
|
|
EULAW
|
Airteagal 24 Comhpháirteanna an bheartais um leanúnachas gnó TFC
|
|
EULAW
|
Airteagal 24 Comhpháirteanna an bheartais um leanúnachas gnó TFC
|
|
EULAW
|
Airteagal 24 Comhpháirteanna an bheartais um leanúnachas gnó TFC
|
|
EULAW
|
Airteagal 28 Rialachas agus eagrú
|
|
EULAW
|
Airteagal 28 Rialachas agus eagrú
|
|
EULAW
|
Airteagal 39 Comhpháirteanna an phlean leanúnachais gnó TFC
|
|
EULAW
|
Airteagal 11 Freagairt agus athshlánú
-
|
|
EULAW
|
Airteagal 12 Beartais agus nósanna imeachta cúltaca, nósanna imeachta agus modhanna athbhunaithe agus athshlánaithe
-
|
|
EULAW
|
Airteagal 32 Slándáil na próiseála
-
|
|
EULAW
|
Airteagal 21 Bearta bainistíochta riosca cibearshlándála
-
|
|
EULAW
|
Airteagal 11 1
1. Mar chuid de chreat bainistíochta riosca TFC dá dtagraítear in Airteagal 6(1) agus bunaithe ar na ceanglais sainaitheantais a leagtar amach in Airteagal 8, cuirfidh eintitis airgeadais beartas cuimsitheach leanúnachais gnó TFC i bhfeidhm, a d’fhéadfaí a ghlacadh mar bheartas tiomnaithe sonrach mar chuid lárnach de bheartas foriomlán leanúnachais gnó é.
|
|
EULAW
|
Airteagal 11 2
2. Cuirfidh eintitis airgeadais an beartas leanúnachais gnó TFC chun feidhme trí shocruithe, pleananna, nósanna imeachta agus sásraí tiomnaithe, iomchuí agus doiciméadaithe, a bhfuil mar aidhm leo:
|
(a)
|
leanúnachas fheidhmeanna criticiúla nó tábhachtacha an eintitis airgeadais a áirithiú;
|
|
(b)
|
freagairt ar gach teagmhas a bhaineann le TFC, agus iad a réiteach, go tapa, go hiomchuí agus go héifeachtach, ar bhealach ina gcuirtear teorainn leis an dochar agus lena dtugtar tús áite d’atosú na ngníomhaíochtaí agus na mbeart athshlánaithe;
|
|
(c)
|
pleananna tiomnaithe a ghníomhachtú, gan mhoill, lena gcumasaítear bearta, próisis agus teicneolaíochtaí srianta atá in oiriúint do gach cineál teagmhais a bhaineann le TFC agus dochar eile a chosc, chomh maith le nósanna imeachta saincheaptha freagartha agus athshlánaithe a bhunaítear i gcomhréir le hAirteagal 12;
|
|
(d)
|
tionchair, dochar agus caillteanais tosaigh a mheas;
|
|
(e)
|
gníomhaíochtaí cumarsáide agus bainistíochta géarchéime a leagan amach lena n-áirithítear go seoltar faisnéis cothrom le dáta chuig gach ball foirne inmheánach ábhartha agus gach geallsealbhóir seachtrach ábhartha i gcomhréir le hAirteagal 14, agus tuairisciú do na húdaráis inniúla i gcomhréir le hAirteagal 19.
|
|
|
EULAW
|
Airteagal 11 3
3. Mar chuid de chreat bainistíochta riosca TFC dá dtagraítear in Airteagal 6(1), cuirfidh eintitis airgeadais pleananna TFC freagartha agus athshlánaithe gaolmhara chun feidhme a chuirfear, i gcás eintitis airgeadais nach micrifhiontair iad, faoi réir athbhreithnithe iniúchta inmheánaigh neamhspleách.
|
|
EULAW
|
Airteagal 11 4
4. Déanfaidh eintitis airgeadais pleananna leanúnachais gnó TFC iomchuí a chur i bhfeidhm, a choinneáil ar bun, agus a thástáil go tréimhsiúil, go háirithe maidir le feidhmeanna criticiúla nó tábhachtacha arna seachfhoinsiú nó arna gcur amach ar conradh trí shocruithe le soláthraithe seirbhísí TFC tríú páirtí.
|
|
EULAW
|
Airteagal 11 5
5. Mar chuid den bheartas foriomlán leanúnachais gnó, déanfaidh eintitis airgeadais anailís ar thionchar gnó a neamhchosaintí ar mhórbhristeacha gnó. Faoin anailís ar thionchar gnó, measúnóidh eintitis airgeadais an tionchar a d’fhéadfadh a bheith ag mórbhristeacha gnó trí bhíthin critéir chainníochtúla agus cháilíochtúla, agus úsáid á baint as sonraí inmheánacha agus seachtracha agus anailís ar chásanna, de réir mar is iomchuí. Measfar san anailís ar thionchar gnó criticiúlacht na bhfeidhmeanna sainaitheanta agus mapáilte gnó, na bpróiseas tacaíochta, na spleáchas tríú páirtí agus na sócmhainní faisnéise, agus a n-idirspleáchais. Áiritheoidh eintitis airgeadais go ndéanfar sócmhainní TFC agus seirbhísí TFC a cheapadh agus a úsáid i gcomhréir iomlán leis an anailís ar thionchar gnó, go háirithe maidir le hiomarcaíocht na gcomhpháirteanna criticiúla uile a áirithiú ar bhealach leordhóthanach.
|
|
EULAW
|
Airteagal 11 6
6. Mar chuid dá mbainistíocht chuimsitheach riosca TFC, déanfaidh eintitis airgeadais na nithe seo a leanas:
|
(a)
|
pleananna leanúnachais gnó TFC agus pleananna freagartha agus athshlánaithe TFC a thástáil i ndáil le córais TFC lena dtacaítear leis na feidhmeanna uile ar bhonn bliantúil ar a laghad, agus i gcás aon mhórathruithe ar chórais TFC lena dtacaítear le feidhmeanna criticiúla nó tábhachtacha;
|
|
(b)
|
tástáil ar na pleananna cumarsáide géarchéime a bhunaítear i gcomhréir le hAirteagal 14.
|
Chun críocha na chéad fhomhíre, pointe (a), áireoidh eintitis airgeadais, nach micrifhiontair iad, sna pleananna tástála faoi chásanna cibirionsaithe agus lascaistrithe idir príomhbhonneagar TFC agus an acmhainneacht iomarcach, cúltacaí agus saoráidí iomarcacha is gá chun na hoibleagáidí a leagtar amach in Airteagal 12 a chomhlíonadh.
Athbhreithneoidh eintitis airgeadais a mbeartas leanúnachais gnó TFC agus a bpleananna freagartha agus athshlánaithe TFC go tráthrialta agus torthaí na dtástálacha, arna ndéanamh i gcomhréir leis an gcéad fhomhír agus le moltaí a eascraíonn as seiceálacha iniúchta nó athbhreithnithe maoirseachta, á gcur san áireamh.
|
|
EULAW
|
Airteagal 11 7
7. Beidh, feidhm bhainistíochta géarchéime ag eintitis airgeadais, nach micrifhiontair iad, ina leagfar amach, i gcás ina ngníomhachtófar a bpleananna leanúnachais gnó TFC nó a bpleananna freagartha agus athshlánaithe TFC, inter alia, nósanna imeachta soiléire chun cumarsáid inmheánach agus sheachtrach i gcás géarchéime a bhainistiú i gcomhréir le hAirteagal 14.
|
|
EULAW
|
Airteagal 11 8
8. Coimeádfaidh eintitis airgeadais taifid sho-inrochtana ar ghníomhaíochtaí roimh imeachtaí bristeacha agus lena linn nuair a ghníomhachtófar a bpleananna leanúnachais gnó TFC nó a bpleananna freagartha agus athshlánaithe TFC.
|
|
EULAW
|
Airteagal 11 9
9. Cuirfidh taisclanna lárnacha urrús cóipeanna de thorthaí na dtástálacha ar leanúnachas gnó TFC, nó de thorthaí cleachtaí eile den sórt sin, ar fáil do na húdaráis inniúla.
|
|
EULAW
|
Airteagal 11 10
10. Tuairisceoidh eintitis airgeadais, nach micrifhiontair iad, d’údaráis inniúla, arna iarraidh sin dóibh, meastachán ar chostais agus caillteanais chomhiomlánaithe bhliantúla de dheasca mórtheagmhais a bhaineann le TFC.
|
|
EULAW
|
Airteagal 11 11
11. I gcomhréir le hAirteagal 16 de Rialacháin (AE) Uimh. 1093/2010, (AE) Uimh. 1094/2010 agus (AE) Uimh. 1095/2010, ceapfaidh ÚMEnna, tríd an gComhchoiste, faoin 17 Iúil 2024 treoirlínte comhchoiteanna maidir le meastachán ar na costais agus na caillteanais chomhiomlánaithe bhliantúla dá dtagraítear i mír 10.
|
|
EULAW
|
Airteagal 12 1
1. Chun a áirithiú go n-athbhunófar córais agus sonraí TFC agus aga neamhfhónaimh íosta, briseadh agus caillteanas teoranta i gceist leo, mar chuid dá gcreat bainistíochta riosca TFC, déanfaidh eintitis airgeadais an méid seo a leanas a fhorbairt agus a dhoiciméadú:
|
(a)
|
beartais agus nósanna imeachta cúltaca lena sonrófar raon feidhme na sonraí is ábhar don chúltaca agus íosmhinicíocht an chúltaca, bunaithe ar chriticiúlacht na faisnéise nó leibhéal rúndachta na sonraí;
|
|
(b)
|
nósanna imeachta agus modhanna athbhunaithe agus athshlánaithe.
|
|
Saincheisteanna nasctha
Naisc
| Cineál naisc |
Saincheist |
|
is related to
|
Annual |
|
is related to
|
relative Control Weighting = 09 |
|
is related to
|
Process |
|
is related to
|
Recover |
|
is related to
|
SCRM Focus Tier 3 TACTICAL |
|
blocks
|
Loss, Theft or Damage of Assets |
|
blocks
|
Unauthorized Modification / Loss of System Integrity |
|
blocks
|
Unauthorized Retention / Inability to Dispose of Data |
|
blocks
|
Business / Service Interruption |
|
blocks
|
Data Loss / Integrity Compromise |
|
blocks
|
Reduced Operational Productivity |
|
blocks
|
System / Data Compromise (Technical Vector) |
|
blocks
|
System / Data Compromise (Non-Technical Vector) |
|
blocks
|
Revenue Loss |
|
blocks
|
Contractual Default / Termination |
|
blocks
|
Loss of Competitive Advantage |
|
blocks
|
Reputational Harm / Loss of Stakeholder Trust |
|
blocks
|
Regulatory / Legal / Contractual Financial Liability |
|
blocks
|
Failure to Support Business / Mission Objectives |
|
blocks
|
Unaddressed Security / Compliance Exposure |
|
blocks
|
Unperformed / Unowned Control Responsibilities |
|
blocks
|
Uncontrolled Internal Security / Privacy Exposure |
|
blocks
|
Uncontrolled Third-Party Security / Privacy Exposure |
|
blocks
|
Loss of Investigative / Evidentiary Capability |
|
blocks
|
Delayed Containment / Increased Incident Impact |
|
blocks
|
Incident Persistence / Recurrence |
|
blocks
|
Incident Response / Recovery Cost |
|
is related to
|
relative Control Weighting = 10 |
|
is related to
|
Govern |
|
is related to
|
SCRM Focus Tier 1 STRATEGIC |
|
is related to
|
SCRM Focus Tier 2 OPERATIONAL |
|
blocks
|
Data Destruction |
|
blocks
|
Data Encrypted for Impact |
|
blocks
|
Inhibit System Recovery |
|
blocks
|
Defacement |
|
blocks
|
Internal Defacement |
|
blocks
|
External Defacement |
|
blocks
|
Disk Wipe |
|
blocks
|
Disk Content Wipe |
|
blocks
|
Disk Structure Wipe |
|
blocks
|
Failure to Achieve Strategic / Mission Objectives |
|
blocks
|
Inability to Demonstrate Due Diligence / Due Care |
|
blocks
|
Unreliable Assurance / Decision Information |
|
blocks
|
Recovery Failure / Unacceptable Recovery Delay |
|
blocks
|
Concentration / Single-Point Dependency Failure |
|
blocks
|
Third-Party Dependency Failure |
|
blocks
|
Loss of Data / Service Availability |
|
blocks
|
Loss of Critical Knowledge / Capability |
|
blocks
|
Drought & Water Shortage |
|
blocks
|
Earthquakes |
|
blocks
|
Fire & Wildfires |
|
blocks
|
Floods |
|
blocks
|
Hurricanes & Tropical Storms |
|
blocks
|
Landslides & Debris Flow |
|
blocks
|
Pandemic (Disease) Outbreaks |
|
blocks
|
Severe Weather |
|
blocks
|
Space Weather |
|
blocks
|
Thunderstorms & Lightning |
|
blocks
|
Tornadoes |
|
blocks
|
Tsunamis |
|
blocks
|
Volcanoes |
|
blocks
|
Winter Storms & Extreme Cold |
|
blocks
|
Civil or Political Unrest |
|
blocks
|
Malicious Cyber Activity |
|
blocks
|
Hazardous Materials Emergencies |
|
blocks
|
Nuclear, Biological and Chemical (NBC) Weapons |
|
blocks
|
Physical Crime |
|
blocks
|
Terrorism & Armed Attacks |
|
blocks
|
Utility Service Disruption |
|
blocks
|
Dysfunctional Management Practices |
|
blocks
|
Human Error |
|
blocks
|
Technical / Mechanical Failure |
|
blocks
|
Statutory / Regulatory / Contractual Change |
|
blocks
|
Economic Shock / Market Disruption |
|
blocks
|
Supplier Financial Distress / Insolvency |
|
blocks
|
Workforce Shortage / Loss of Critical Skills / Labor Disruption |
|
blocks
|
Infrastructure Failure / Degradation |
|
blocks
|
PS-01.04B |
|
blocks
|
PS-02.02B |
|
blocks
|
OPS-21.01B |
|
blocks
|
SSO-06.02B |
|
blocks
|
BCM-01.01B |
|
blocks
|
BCM-01.02B |
|
blocks
|
BCM-03.01B |
|
is blocked by
|
BCD-02 Business Continuity Management System (BCMS) – Assessment Procedure |
|
blocks
|
CP-01 Policy and Procedures |
|
blocks
|
CP-02 Contingency Plan |
|
blocks
|
CP-10 System Recovery and Reconstitution |
|
blocks
|
IR-04(03) Continuity of Operations |
|
blocks
|
PM-08 Critical Infrastructure Plan |
|
blocks
|
CP-01 [L] Policy and Procedures |
|
blocks
|
CP-02 [L] Contingency Plan |
|
blocks
|
CP-10 [L] System Recovery and Reconstitution |
|
blocks
|
CP-01 [M] Policy and Procedures |
|
blocks
|
CP-02 [M] Contingency Plan |
|
blocks
|
CP-10 [M] System Recovery and Reconstitution |
|
blocks
|
CP-01 [H] Policy and Procedures |
|
blocks
|
CP-02 [H] Contingency Plan |
|
blocks
|
CP-10 [H] System Recovery and Reconstitution |
|
blocks
|
PM-08 [P] Critical Infrastructure Plan |
|
blocks
|
GV.SC-08 Relevant suppliers and other third parties are included in incident planning, response, and recovery activities |
|
blocks
|
ID.IM-04 Incident response plans and other cybersecurity plans that affect operations are established, communicated, maintained, and improved |
|
blocks
|
PR.IR-02 The organization's technology assets are protected from environmental threats |
|
blocks
|
PR.IR-03 Mechanisms are implemented to achieve resilience requirements in normal and adverse situations |
|
blocks
|
RS.MA-05 The criteria for initiating incident recovery are applied |
|
blocks
|
RC RECOVER |
|
blocks
|
RC.RP Incident Recovery Plan Execution |
|
blocks
|
RC.RP-02 Recovery actions are selected, scoped, prioritized, and performed |
|
blocks
|
RC.RP-04 Critical mission functions and cybersecurity risk management are considered to establish post-incident operational norms |
- Secure Controls Framework -
EN: GRCA includes the Secure Controls Framework® (SCF) content, © Secure Controls Framework Council, LLC, used under the Creative Commons Attribution-NoDerivatives 4.0 International Public License. SCF control numbers, names, descriptions and mappings appear exactly as published by the SCF Council – https://securecontrolsframework.com. GRCA may group or reorder SCF content for display, which does not change SCF content; the mappings are shown as links to the frameworks they name. Learn more at https://securecontrolsframework.com.
DE: GRCA enthält Inhalte des Secure Controls Framework® (SCF), © Secure Controls Framework Council, LLC, genutzt unter der Creative Commons Attribution-NoDerivatives 4.0 International Public License. Nummern, Namen, Beschreibungen und Zuordnungen der SCF-Controls erscheinen genau so, wie der SCF Council sie veröffentlicht – https://securecontrolsframework.com. GRCA gruppiert oder sortiert SCF-Inhalte für die Anzeige, ohne sie zu verändern; die Zuordnungen erscheinen als Verknüpfungen zu den genannten Regelwerken. Mehr unter https://securecontrolsframework.com.
|