+SYS.1.7.A33 Separation of Test and Production Systems in z/OS (H)

SYS.1.7.A33 Separation of Test and Production Systems in z/OS (H)

Technical measures SHOULD be taken to separate development and test systems from production systems in z/OS. Possible access options via shared hard disks and the Parallel Sysplex SHOULD be taken into account.

1. Forbhreathnú

Teideal Caighdeán

1.1 Tagairtí

1.2 Ceanglais aitheanta

1.3 Rialacháin ghaolmhara

2. Ceanglais aitheanta

Ceanglais
Foinse Ceanglas

3. Rialacháin ghaolmhara

Rialacháin
Foinse Rialáil

Saincheisteanna nasctha