+SYS.1.7.A33 Separation of Test and Production Systems in z/OS (H)

SYS.1.7.A33 Separation of Test and Production Systems in z/OS (H)

Technical measures SHOULD be taken to separate development and test systems from production systems in z/OS. Possible access options via shared hard disks and the Parallel Sysplex SHOULD be taken into account.

1. Översikt

Rubrik Standard

1.1 Referenser

1.2 Identifierade krav

1.3 Relaterade regleringar

2. Identifierade krav

Krav
Källa Krav

3. Relaterade regleringar

Regleringar
Källa Reglering

Länkade ärenden