+SYS.1.7.A33 Separation of Test and Production Systems in z/OS (H)

SYS.1.7.A33 Separation of Test and Production Systems in z/OS (H)

Technical measures SHOULD be taken to separate development and test systems from production systems in z/OS. Possible access options via shared hard disks and the Parallel Sysplex SHOULD be taken into account.

1. Pregled

Naslov Standard

1.1 Sklici

1.2 Ugotovljene zahteve

1.3 Povezani predpisi

2. Ugotovljene zahteve

Zahteve
Vir Zahteva

3. Povezani predpisi

Predpisi
Vir Regulativa

Povezane zadeve