|
+Article 3 (26) |
Article 3 (26)‘established total electrical power demand of the ship at berth’ means the highest value, expressed in kilowatts, of the total demand for electricity of a ship at berth, including hotel and cargo handling workloads; 1. Forbhreathnú
1.1 Tagairtí1.2 Ceanglais aitheanta1.3 Caighdeáin ghaolmhara2. Ceanglais aitheanta
3. Caighdeáin ghaolmhara
|