|
+Article 3 (26) |
Article 3 (26)‘established total electrical power demand of the ship at berth’ means the highest value, expressed in kilowatts, of the total demand for electricity of a ship at berth, including hotel and cargo handling workloads; 1. Przegląd
1.1 Odwołania1.2 Zidentyfikowane wymagania1.3 Powiązane normy2. Zidentyfikowane wymagania
3. Powiązane normy
|