|
+Article 3 (26) |
Article 3 (26)‘established total electrical power demand of the ship at berth’ means the highest value, expressed in kilowatts, of the total demand for electricity of a ship at berth, including hotel and cargo handling workloads; 1. Översikt
1.1 Referenser1.2 Identifierade krav1.3 Relaterade standarder2. Identifierade krav
3. Relaterade standarder
|