+1. At all relevant points, transmission system operators shall publish the information as listed in …
|
1. At all relevant points, transmission system operators shall publish the information as listed in …
|
1.
|
At all relevant points, transmission system operators shall publish the information as listed in the second subparagraph, points (a) to (g), for all services and ancillary services provided, in particular information on blending, ballasting and conversion. That information shall be published on a numerical basis, in hourly or daily periods, equal to the smallest reference period for capacity booking and renomination and the smallest settlement period for which imbalance charges are calculated. If the smallest reference period is different from a daily period, information as listed in the second subparagraph, points (a) to (g), shall be made available also for the daily period.
The following information and its updates shall be published as soon as available to the system operator (in near real time):
|
(a)
|
the technical capacity for flows in both directions;
|
|
(b)
|
the total contracted firm and interruptible capacity in both directions;
|
|
(c)
|
the nominations and re-nominations in both directions;
|
|
(d)
|
the available firm and interruptible capacity in both directions;
|
|
(e)
|
actual physical flows;
|
|
(f)
|
planned and actual interruption of interruptible capacity;
|
|
(g)
|
planned and unplanned interruptions to firm services as well as the information on restoration of the firm services, in particular, maintenance of the system and the likely duration of any interruption due to maintenance; planned interruptions shall be published at least 42 days in advance;
|
|
(h)
|
occurrence of unsuccessful, legally valid requests for firm capacity products with a duration of one month or longer including the number and volume of the unsuccessful requests;
|
|
(i)
|
in the case of auctions, where and when firm capacity products with a duration of one month or longer have cleared at prices higher than the reserve price;
|
|
(j)
|
where and when no firm capacity product with a duration of one month or longer has been offered in the regular allocation process;
|
|
(k)
|
total capacity made available through the application of the congestion-management procedures laid down in points 2.2.2 to 2.2.5 per applied congestion-management procedure.
|
|
1. Pregled
1.1 Reference
1.2 Utvrđeni zahtjevi
1.3 Povezani standardi
2. Utvrđeni zahtjevi
3. Povezani standardi
- Builddate: 15.07.2024 00:00:00 -Doknr: CELEX:32024R1789
- EULAW -
EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.
DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.
|