|
+Article 52 2. |
Article 52 2.The operator shall determine the mass of each type of waste, if possible according to the European Waste List established by Decision 2000/532/EC, prior to accepting the waste at the waste incineration plant or waste co-incineration plant.
1. Apžvalga
1.1 Nuorodos1.2 Nustatyti reikalavimai1.3 Susiję standartai2. Nustatyti reikalavimai
3. Susiję standartai
|