|
+Article 52 2. |
Article 52 2.The operator shall determine the mass of each type of waste, if possible according to the European Waste List established by Decision 2000/532/EC, prior to accepting the waste at the waste incineration plant or waste co-incineration plant.
1. Prehľad
1.1 Odkazy1.2 Identifikované požiadavky1.3 Súvisiace štandardy2. Identifikované požiadavky
3. Súvisiace štandardy
|