|
+Article 52 2. |
Article 52 2.The operator shall determine the mass of each type of waste, if possible according to the European Waste List established by Decision 2000/532/EC, prior to accepting the waste at the waste incineration plant or waste co-incineration plant.
1. Visão geral
1.1 Referências1.2 Requisitos identificados1.3 Normas relacionadas2. Requisitos identificados
3. Normas relacionadas
|