+Artikolu 11 Tibdil, reviżjoni, aġġornament u rtirar tal-permessi għall-ħżin
---+Article 11 1.
---+Article 11 2.
---+Article 11 3.
---+Article 11 4.

Artikolu 11 Tibdil, reviżjoni, aġġornament u rtirar tal-permessi għall-ħżin

Artikolu 11

Tibdil, reviżjoni, aġġornament u rtirar tal-permessi għall-ħżin

1.  L-operatur għandu jinforma lill-awtorità kompetenti bi kwalunkwe bidliet ippjanati fl-operazzjoni tas-sit tal-ħżin, inkluż tibdil li jikkonċerna l-operatur. Fejn xieraq, l-awtorità kompetenti għandha taġġorna l-permess għall-ħżin jew il-kundizzjonijiet tal-permess.

2.  L-Istati Membri għandhom jiżguraw li l-ebda bidla sostanzjali ma tiġi implimentata mingħajr il-ħruġ ta’ permess għall-ħżin ġdid jew aġġornat konformement ma’ din id-Direttiva. L-ewwel inċiż tal-punt 13 tal-Anness II tad-Direttiva 85/337/KEE għandu japplika f’każijiet bħal dawn.

3.  L-awtorità kompetenti għandha tirrivedi u fejn meħtieġ taġġorna jew, jekk ma jistax isir mod ieħor, tirtira l-permess għall-ħżin:

(a) jekk tkun ġiet innotifikata jew tinġibdilha l-attenzjoni bi tnixxijiet jew kwalunkwe irregolarità sinifikanti taħt l-Artikolu 16(1);

(b) jekk ir-rapporti preżentati taħt l-Artikolu 14 jew l-ispezzjonijiet ambjentali mwettqa taħt l-Artikolu 15 juru nuqqas ta’ konformità mal-kundizzjonijiet tal-permess jew riskji ta’ tnixxijiet jew irregolaritajiet sinifikanti;

(c) jekk tkun konxja minn kwalunkwe nuqqas ieħor mill-operatur li jilħaq il-kundizzjonijiet tal-permess;

(d) jekk jidher li dan huwa neċessarju abbażi tal-aktar sejbiet xjentifiċi u progress teknoloġiku reċenti; jew

(e) mingħajr preġudizzju għall-punti (a) sa (d), ħames snin wara l-ħruġ tal-permess u mbagħad kull għaxar snin.

4.  Wara li jiġi rtirat permess taħt il-paragrafu 3, l-awtorità kompetenti għandha jew toħroġ permess għall-ħżin ġdid jew tagħlaq is-sit tal-ħżin konformement mal-punt (c) tal-Artikolu 17(1). Sakemm ma jinħariġx permess għall-ħżin ġdid, l-awtorità kompetenti għandha temporanjament twettaq l-obbligi legali kollha relatati mal-kriterji ta’ aċċettazzjoni meta l-awtorità kompetenti tiddeċiedi li l-injezzjonijiet tas-CO2, il-monitoraġġ u l-miżuri korrettivi ma jitwaqqfux konformement mar-rekwiżiti stabbiliti f’din id-Direttiva, iċ-ċediment tal-kwoti f’każijiet ta’ tnixxija taħt id-Direttiva 2003/87/KE u azzjoni preventiva u ta’ rimedju taħt l-Artikoli 5(1) u 6(1) tad-Direttiva 2004/35/KE. L-awtorità kompetenti għandha tirkupra kwalunkwe spejjeż magħmula mingħand l-operatur preċedenti anke billi tagħmel użu mill-garanzija finanzjarja msemmija fl-Artikolu 19. Fil-każ tal-għeluq tas-sit tal-ħżin taħt il-punt (c) tal-Artikolu 17(1), għandu japplika l-Artikolu 17(4).

1. Ħarsa ġenerali

,
Titlu Regolamentazzjoni
Article 11 1.
The operator shall inform the competent authority of any changes planned in the operation of the storage site, including changes concerning the operator. Where appropriate, the competent authority shall update the storage permit or the permit conditions.
Article 11 2.
Member States shall ensure that no substantial change is implemented without a new or updated storage permit issued in accordance with this Directive. Annex II, point 13, first indent of Directive 85/337/EEC shall apply in such cases.
Article 11 3.

The competent authority shall review and where necessary update or, as a last resort, withdraw the storage permit:

(a) 

if it has been notified or made aware of any leakages or significant irregularities pursuant to Article 16(1);

(b) 

if the reports submitted pursuant to Article 14 or the environmental inspections carried out pursuant to Article 15 show non-compliance with permit conditions or risks of leakages or significant irregularities;

(c) 

if it is aware of any other failure by the operator to meet the permit conditions;

(d) 

if it appears necessary on the basis of the latest scientific findings and technological progress; or

(e) 

without prejudice to points (a) to (d), five years after issuing the permit and every 10 years thereafter.

Article 11 4.
After a permit has been withdrawn pursuant to paragraph 3, the competent authority shall either issue a new storage permit or close the storage site pursuant to Article 17(1)(c). Until a new storage permit has been issued, the competent authority shall temporarily take over all legal obligations relating to acceptance criteria where the competent authority decides to continue CO2 injections, monitoring and corrective measures pursuant to the requirements laid down in this Directive, the surrender of allowances in cases of leakage pursuant to Directive 2003/87/EC and preventive and remedial action pursuant to Articles 5(1) and 6(1) of Directive 2004/35/EC. The competent authority shall recover any costs incurred from the former operator, including by drawing on the financial security referred to in Article 19. In case of closure of the storage site pursuant to Article 17(1)(c), Article 17(4) shall apply.

1.1 Referenzi

1.2 Rekwiżiti identifikati

1.3 Standards relatati

2. Rekwiżiti identifikati

Rekwiżiti
Sors Rekwiżit

3. Standards relatati

Standards
Sors Rekwiżit
  • Builddate: 24.12.2018 00:00:00 -Doknr: CELEX:32009L0031
  • EULAW -

    EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.

    DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.