Artikolu 17 L-obbligazzjonijiet tal-għeluq u ta’ wara l-għeluq

Artikolu 17

L-obbligazzjonijiet tal-għeluq u ta’ wara l-għeluq

1.  Sit tal-ħżin għandu jingħalaq:

(a) jekk il-kundizzjonijiet rilevanti ddikjarati fil-permess jintlaħqu;

(b) fuq talba issostanzjata tal-operatur, wara awtorizzazzjoni tal-awtorità kompetenti; jew

(c) jekk l-awtorità kompetenti tiddeċiedi hekk wara l-irtirar ta’ permess għall-ħżin taħt l-Artikolu 11(3).

2.  Wara li sit tal-ħżin jingħalaq taħt il-punti (a) jew (b) tal-paragrafu 1, l-operatur jibqa’ responsabbli għall-monitoraġġ, għar-rappurtar, u għall-miżuri korrettivi konformement mar-rekwiżiti stabbiliti f’din id-Direttiva, u għall-obbligazzjonijiet kollha relatati maċ-ċediment tal-kwoti f’każ ta’ tnixxijiet taħt id-Direttiva 2003/87/KE u azzjonijiet preventivi u ta’ rimedju taħt l-Artikoli 5 sa 8 tad-Direttiva 2004/35/KE, sakemm ir-responsabbiltà għas-sit tal-ħżin tiġi trasferita lill-awtorità kompetenti taħt l-Artikolu 18(1) sa (5) ta’ din id-Direttiva. L-operatur għandu wkoll ikun responsabbli għall-issiġillar tas-sit tal-ħżin u t-tneħħija tal-faċilitajiet ta’ injezzjoni.

3.  L-obbligazzjonijiet imsemmija fil-paragrafu 2 għandhom jiġu sodisfatti fuq il-bażi ta’ pjan ta’ wara l-għeluq imfassal mill-operatur ibbażat fuq l-aħjar prattika u konformement mar-rekwiżiti stabbiliti fl-Anness II. Il-pjan provviżorju ta’ wara l-għeluq għandu jiġi preżentat lill-awtorità kompetenti u jiġi approvat minnha taħt il-punt 8 tal-Artikolu 7 u taħt il-punt 7 tal-Artikolu 9. Qabel l-għeluq ta’ sit tal-ħżin taħt il-punt (a) jew il-punt (b) tal-paragrafu 1 ta’ dan l-Artikolu, il-pjan provviżorju ta’ wara l-għeluq għandu jkun:

(a) aġġornat kif meħtieġ, b’kont meħud tal-analiżi tar-riskju, l-aħjar prattika u t-titjib teknoloġiku;

(b) preżentat lill-awtorità kompetenti għall-approvazzjoni tagħha; u

(c) approvat mill-awtorità kompetenti bħala l-pjan ta’ wara l-għeluq definittiv.

4.  Wara li sit tal-ħżin jingħalaq taħt il-punt (c) tal-paragrafu 1, l-awtorità kompetenti għandha tkun responsabbli, għall-monitoraġġ, u l-miżuri korrettivi konformement mar-rekwiżiti stabbiliti f’din id-Direttiva u għall-obbligazzjonijiet kollha relatati maċ-ċediment tal-kwoti fil-każ ta’ tnixxija taħt id-Direttiva 2003/87/KE u għall-azzjoni preventiva u ta’ rimedju taħt l-Artikolu 5(1) u 6(1) tad-Direttiva 2004/35/KE. Ir-rekwiżiti ta’ wara l-għeluq taħt din id-Direttiva għandhom jiġu sodisfatti mill-awtorità kompetenti fuq il-bażi tal-pjan provviżorju ta’ wara l-għeluq imsemmi fil-paragrafu 3 ta’ dan l-Artikolu, li għandu jkun aġġornat kif meħtieġ.

5.  L-awtorità kompetenti għandha tirkupra mingħand l-operatur l-ispejjeż magħmulin fir-rigward tal-miżuri msemmijin fil-paragrafu 4, anke bl-użu tas-sigurtà finanzjarja taħt l-Artikolu 19.

1. Ħarsa ġenerali

,
Titlu Regolamentazzjoni
Article 17 1.

A storage site shall be closed:

(a) 

if the relevant conditions stated in the permit have been met;

(b) 

at the substantiated request of the operator, after authorisation of the competent authority; or

(c) 

if the competent authority so decides after the withdrawal of a storage permit pursuant to Article 11(3).

Article 17 2.
After a storage site has been closed pursuant to points (a) or (b) of paragraph 1, the operator remains responsible for monitoring, reporting and corrective measures, pursuant to the requirements laid down in this Directive, and for all obligations relating to the surrender of allowances in case of leakages pursuant to Directive 2003/87/EC and preventive and remedial actions pursuant to Articles 5 to 8 of Directive 2004/35/EC until the responsibility for the storage site is transferred to the competent authority pursuant to Article 18(1) to (5) of this Directive. The operator shall also be responsible for sealing the storage site and removing the injection facilities.
Article 17 3.

The obligations referred to in paragraph 2 shall be fulfilled on the basis of a post-closure plan designed by the operator based on best practice and in accordance with the requirements laid down in Annex II. A provisional post-closure plan shall be submitted to and approved by the competent authority pursuant to Article 7(8) and Article 9(7). Prior to the closure of a storage site pursuant to points (a) or (b) of paragraph 1 of this Article, the provisional post-closure plan shall be:

(a) 

updated as necessary, taking account of risk analysis, best practice and technological improvements;

(b) 

submitted to the competent authority for its approval; and

(c) 

approved by the competent authority as the definitive post-closure plan.

Article 17 4.
After a storage site has been closed pursuant to paragraph 1(c), the competent authority shall be responsible for monitoring and corrective measures pursuant to the requirements laid down in this Directive and for all obligations relating to the surrender of allowances in case of leakages pursuant to Directive 2003/87/EC and preventive and remedial action pursuant to Articles 5(1) and 6(1) of Directive 2004/35/EC. The post-closure requirements pursuant to this Directive shall be fulfilled by the competent authority on the basis of the provisional post-closure plan referred to in paragraph 3 of this Article, which shall be updated as necessary.
Article 17 5.
The competent authority shall recover from the operator the costs incurred in relation to the measures referred to in paragraph 4, including by drawing on the financial security pursuant to Article 19.

1.1 Referenzi

1.2 Rekwiżiti identifikati

1.3 Standards relatati

2. Rekwiżiti identifikati

Rekwiżiti
Sors Rekwiżit

3. Standards relatati

Standards
Sors Rekwiżit
  • Builddate: 24.12.2018 00:00:00 -Doknr: CELEX:32009L0031
  • EULAW -

    EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.

    DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.