+Article 27 1.

Article 27 1.

Operators obliged to draw up waste management plans in accordance with Article 5 of Directive 2006/21/EC shall provide to the competent authority as defined in Article 3, point (27), of that Directive a preliminary economic assessment study regarding the potential recovery of critical raw materials, from:

(a) 

the extractive waste stored in the facility; and

(b) 

the extractive waste being generated or, where considered more effective, from the extracted volume prior to it becoming waste.

Operators shall be exempt from the obligation laid down in the first subparagraph of this paragraph where they can demonstrate to the competent authority as defined in Article 3, point (27), of Directive 2006/21/EC, with a high degree of certainty, that the extractive waste does not contain critical raw materials that are technically recoverable.

1. Prezentare generală

,
Titlu Reglementare

1.1 Referințe

1.2 Cerințe identificate

1.3 Standarde asociate

2. Cerințe identificate

Cerințe
Sursă Cerință

3. Standarde asociate

Standarde
Sursă Cerință
  • Builddate: 03.05.2024 00:00:00 -Doknr: CELEX:32024R1252
  • EULAW -

    EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.

    DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.