+DER.3.2.A7 Performance of an IS Audit [IS Audit Team] (B)

DER.3.2.A7 Performance of an IS Audit [IS Audit Team] (B)

Within the framework of an IS audit, the IS Audit Team MUST perform a document audit and an on-site audit. All the results of the two audits MUST be documented in writing and summarised in an IS audit report.

Before performing an IS cross-cutting audit for the first time, the person in charge of the IS audit MUST select an IS partial audit as the IS audit procedure. The IS partial audit MUST be completed with a positive result before an IS cross-cutting audit is performed.

1. Prezentare generală

Titlu Standard

1.1 Referințe

1.2 Cerințe identificate

1.3 Reglementări asociate

2. Cerințe identificate

Cerințe
Sursă Cerință

3. Reglementări asociate

Reglementări
Sursă Reglementare

Tichete legate

Legături
Tip de legătură Tichet
blocks G 0.18 Poor Planning or Lack of Adaptation