+Article 12 5.
|
Article 12 5.
Where modifications are to be made to the production installation that entail a material change, or it is intended to dismantle a fixed production installation, the operator shall prepare an amended report on major hazards, to be submitted pursuant to point (f) of Article 11(1) by a deadline specified by the competent authority, in accordance with Annex I, Part 6.
1. Преглед
1.1 Препратки
1.2 Идентифицирани изисквания
1.3 Свързани стандарти
2. Идентифицирани изисквания
Изисквания
| Източник |
Изискване |
3. Свързани стандарти
Стандарти
| Източник |
Изискване |
|