+Article 12 5.

Article 12 5.

Where modifications are to be made to the production installation that entail a material change, or it is intended to dismantle a fixed production installation, the operator shall prepare an amended report on major hazards, to be submitted pursuant to point (f) of Article 11(1) by a deadline specified by the competent authority, in accordance with Annex I, Part 6.

1. Resumen

,
Título Regulación

1.1 Referencias

1.2 Requisitos identificados

1.3 Estándares relacionados

2. Requisitos identificados

Requisitos
Fuente Requisito

3. Estándares relacionados

Estándares
Fuente Requisito