+Article 12 5.
|
Article 12 5.
Where modifications are to be made to the production installation that entail a material change, or it is intended to dismantle a fixed production installation, the operator shall prepare an amended report on major hazards, to be submitted pursuant to point (f) of Article 11(1) by a deadline specified by the competent authority, in accordance with Annex I, Part 6.
1. Apžvalga
| Pavadinimas |
Reguliavimas |
,
1.1 Nuorodos
1.2 Nustatyti reikalavimai
1.3 Susiję standartai
2. Nustatyti reikalavimai
Reikalavimai
| Šaltinis |
Reikalavimas |
3. Susiję standartai
Standartai
| Šaltinis |
Reikalavimas |
|