+Article 12 5.
|
Article 12 5.
Where modifications are to be made to the production installation that entail a material change, or it is intended to dismantle a fixed production installation, the operator shall prepare an amended report on major hazards, to be submitted pursuant to point (f) of Article 11(1) by a deadline specified by the competent authority, in accordance with Annex I, Part 6.
1. Pārskats
1.1 Atsauces
1.2 Identificētās prasības
1.3 Saistītie standarti
2. Identificētās prasības
3. Saistītie standarti
|