+Article 53 Establishment of the EU DSO entity
---+Article 53 1.
---+Article 53 2.
---+Article 53 3.
---+Article 53 4.
---+Article 53 5.
---+Article 53 6.
---+Article 53 7.
|
Article 53 Establishment of the EU DSO entity
1. Overview
| Summary |
Regulation |
|
Article 53 1.
|
The EU DSO entity shall consist of, at least, a general assembly, a board of directors, a strategic advisor group, expert groups and a secretary-general.
|
|
Article 53 2.
|
By 5 July 2020, the distribution system operators shall submit to the Commission and to ACER, the draft statutes, in accordance with Article 54, including a code of conduct, a list of registered members, the draft rules of procedure, including the rules of procedures on the consultation with the ENTSO for Electricity and other stakeholders and the financing rules, of the EU DSO entity to be established. The draft rules of procedure of the EU DSO entity shall ensure balanced representation of all participating distribution system operators.
|
|
Article 53 3.
|
Within two months of receipt of the draft statutes, the list of members and the draft rules of procedure, ACER shall provide the Commission with its opinion, after consulting the organisations representing all stakeholders, in particular distribution system users.
|
|
Article 53 4.
|
Within three months of receipt of ACER's opinion, the Commission shall deliver an opinion on the draft statutes, the list of members and the draft rules of procedure, taking into account ACER's opinion as provided for in paragraph 3.
|
|
Article 53 5.
|
Within three months of receipt of the Commission's positive opinion, the distribution system operators shall establish the EU DSO entity and shall adopt and publish its statutes and rules of procedure.
|
|
Article 53 6.
|
The documents referred to in paragraph 2 shall be submitted to the Commission and to ACER where there are changes thereto or upon the reasoned request of either of them. The Commission and ACER shall deliver an opinion in line with the process set out in paragraphs 2, 3 and 4.
|
|
Article 53 7.
|
The costs related to the activities of the EU DSO entity shall be borne by the distribution system operators that are registered members and shall be taken into account in the calculation of tariffs. Regulatory authorities shall only approve costs that are reasonable and proportionate.
|
,
1.1 References
1.2 Identified Requirements
1.3 Related Standards
2. Identified Requirements
Requirements
| Source |
Requirement |
3. Related Standards
Standards
| Source |
Requirement |
- Builddate: 16.07.2024 00:00:00 -Doknr: CELEX:32019R0943
- EULAW -
EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.
DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.
|