+Article 6 Certification
---+Article 6 1
---+Article 6 2
---+Article 6 3
---+Article 6 4
---+Article 6 5
---+Article 6 6
|
Article 6 Certification
1. Overview
| Summary |
Regulation |
|
Article 6 1
|
1. By 17 December 2027, and every three years thereafter, economic operators that are large enterprises shall demonstrate that the handling process at each installation where plastic pellets in quantities equal to or above a threshold of 1 500 tonnes have been handled in the previous calendar year is compliant with the requirements set out in Annex I, by obtaining a certificate issued by a certifier.
|
|
Article 6 2
|
2. By 17 December 2028, and every four years thereafter, economic operators that are medium-sized enterprises shall demonstrate that the handling process at each installation where plastic pellets in quantities equal to or above a threshold of 1 500 tonnes have been handled in the previous calendar year is compliant with the requirements set out in Annex I, by obtaining a certificate issued by a certifier.
|
|
Article 6 3
|
3. By 17 December 2030, economic operators that are small enterprises shall demonstrate that the handling process at each installation where plastic pellets in quantities equal to or above a threshold of 1 500 tonnes have been handled in the previous calendar year is compliant with the requirements set out in Annex I, by obtaining a certificate issued by a certifier. That certificate shall be valid for 5 years.
The economic operators referred to in the first subparagraph of this paragraph shall comply with Article 5(2) after the expiry period of the certificate unless they choose to renew it in accordance with the first subparagraph of this paragraph.
|
|
Article 6 4
|
4. Certifiers shall carry out spot checks, including, if accessible, at immediately surrounding areas, to ensure that the risk management plan is adequate to prevent plastic pellet losses and that all measures included therein are duly implemented.
|
|
Article 6 5
|
5. Certificates shall meet the following requirements:
|
(a)
|
they are issued in accordance with the model form set out in Annex IV and in electronic form;
|
|
(b)
|
they specify the economic operator, the installation covered by the certificate, the date of each spot check carried out, and the period of validity;
|
|
(c)
|
they certify conformity of the installation covered by the certificate with the requirements set out in Annex I;
|
|
|
Article 6 6
|
6. Without undue delay, certifiers shall notify the competent authority of the following:
|
(b)
|
certificates suspended or withdrawn;
|
|
(c)
|
changes in certificates.
|
|
,
1.1 References
1.2 Identified Requirements
1.3 Related Standards
2. Identified Requirements
Requirements
| Source |
Requirement |
3. Related Standards
Standards
| Source |
Requirement |
- Builddate: 26.11.2025 00:00:00 -Doknr: CELEX:32025R2365
- EULAW -
EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.
DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.
|