+46. When carrying out the assessment of the identification of a material deficiency or a specific …
|
46. When carrying out the assessment of the identification of a material deficiency or a specific …
When carrying out the assessment of the identification of a material deficiency or a specific area of improvement in the recovery plan related to the ORC according to paragraphs 44 and 45, competent authorities should take into account the following non-exhaustive situations: - a. whether the institution already operates in severe stressed conditions, including where a capital conservation plan in accordance with Article 142 of Directive 2013/36/EU has been requested;
- b. whether the institution has already improved the ORC compared to previous recovery plans and there is no longer room for ORC potential improvement given the size, business model and risk profile of the institution;
- c. whether the institution’s capital, leverage and/or liquidity position displays sound headroom with respect to the regulatory requirements and therefore the scenarios employed by the institution are extremely severe and thus too penalising with respect to peers.
1. Overview
1.1 References
1.2 Identified Requirements
1.3 Related Standards
2. Identified Requirements
Requirements
| Source |
Requirement |
3. Related Standards
Standards
| Source |
Requirement |
- EBA - Published by the European Banking Authority at https://www.eba.europa.eu/
|