|
+Article 17 3. |
Article 17 3.Where cross-zonal capacity is available after the intraday cross-zonal gate closure time, transmission system operators shall use the cross-zonal capacity for the exchange of balancing energy or for the operation of the imbalance netting process.
1. Overview
1.1 References1.2 Identified Requirements1.3 Related Standards2. Identified Requirements
3. Related Standards
|