+Article 17 3. |
Article 17 3.Where cross-zonal capacity is available after the intraday cross-zonal gate closure time, transmission system operators shall use the cross-zonal capacity for the exchange of balancing energy or for the operation of the imbalance netting process.
1. Panoramica
1.1 Riferimenti1.2 Requisiti identificati1.3 Standard correlati2. Requisiti identificati
3. Standard correlati
|