|
+Article 17 3. |
Article 17 3.Where cross-zonal capacity is available after the intraday cross-zonal gate closure time, transmission system operators shall use the cross-zonal capacity for the exchange of balancing energy or for the operation of the imbalance netting process.
1. Prezentare generală
1.1 Referințe1.2 Cerințe identificate1.3 Standarde asociate2. Cerințe identificate
3. Standarde asociate
|