|
+Article 17 3. |
Article 17 3.Where cross-zonal capacity is available after the intraday cross-zonal gate closure time, transmission system operators shall use the cross-zonal capacity for the exchange of balancing energy or for the operation of the imbalance netting process.
1. Pārskats
1.1 Atsauces1.2 Identificētās prasības1.3 Saistītie standarti2. Identificētās prasības
3. Saistītie standarti
|