+Article 23 6.

Article 23 6.

By 5 January 2020, the ENTSO for Electricity shall submit to ACER a draft methodology for calculating:

(a) 

the value of lost load;

(b) 

the cost of new entry for generation, or demand response; and

(c) 

the reliability standard referred to in Article 25.

The methodology shall be based on transparent, objective and verifiable criteria.

1. Overview

,
Summary Regulation

1.1 References

1.2 Identified Requirements

1.3 Related Standards

2. Identified Requirements

Requirements
Source Requirement

3. Related Standards

Standards
Source Requirement