|
+Article 23 6. |
Article 23 6.By 5 January 2020, the ENTSO for Electricity shall submit to ACER a draft methodology for calculating:
(a)
the value of lost load;
(b)
the cost of new entry for generation, or demand response; and
(c)
the reliability standard referred to in Article 25. The methodology shall be based on transparent, objective and verifiable criteria. 1. Forbhreathnú
1.1 Tagairtí1.2 Ceanglais aitheanta1.3 Caighdeáin ghaolmhara2. Ceanglais aitheanta
3. Caighdeáin ghaolmhara
|